Partial Roof Replacement at Stults Road Elementary School
The BEAM Professionals team designed the roof replacement at the areas identified and compiled the construction documents for the Stults Road Elementary School . The scope of consisted of removal of the existing gravel from roof, and installed a new tapered EPS insulation and light weight insulating concrete. From there, the new Modified Bitumen “Cool Roof” system with associated sheet metal flashing and trim was installed. During the construction phase, the BEAM team conducted weekly site observations. At project close out the BEAM team performed the final punch list and obtained all necessary warranties to complete the close out phase of the project.
Client
Richardson ISD
Project Type
Partial Roof Replacement
Project Location
Richardson and Dallas, Texas
Project Size
182,720 square feet
Services Provided
Construction documents to over-lay partial roofs with lightweight insulating concrete, Modified bitumen “Cool Roof” roof system and all related sheet metal flashing and trim.
Project Duration
90 days
Project Manager
Harold Stephens