Partial Roof Replacement at Big Springs Elementary School

BEAM assisted Richardson ISD throughout the project and completed design and construction documents for Big Springs Elementary School. The project consisted of removing the existing gravel, preparing the roof and pouring light weight insulating concrete. Once the original roof was removed, a base sheet was installed over the light weight insulating concrete followed by a two ply modified bitumen “Cool Roof” system and associated roofing components. BEAM followed up thoroughly with the roofing contractor during the construction by conducting site visits and, upon completion, BEAM assisted with obtaining all warranties and close out documents needed.

We confidently recommend BEAM Professionals as a solid and reliable roofing consultant.

Richardson ISD
Client

Richardson ISD

Project Type

Partial Roof Replacement

Project Location

Richardson, Texas

Project Size

70,860

Services Provided

Provide Construction Documents, Proposal/Bidding, Construction Administration, Quality Control, Close Out & Warranty Assistance

Project Duration

5 Months

Project Manager

Casey Gaither