Stone Tower Partial Roof Replacement
Working in concert with the ECOM, BEAM Professionals successfully completed a partial roof replacement of the 11-story roof of the Stone Tower. The scope of work consisted of removing the built-up roof gravel system and installed new tapered insulation, recovery board and a two-ply modified bitumen “cool roof” roof system, which included the associated sheet metal flashing and trim.
This project from construction documents to final completion was completed within the owner’s budget and time constraints.
Client
ECOM Real Estate
Project Type
Roof Replacement
Project Location
Dallas, Texas
Project Size
1,000 Square Feet
Services Provided
Site Investigation, Construction Documents, Bidding, Construction Administration, Warranty Phase
Project Duration
5 Months
Project Manager
Harold Stephens